Installing a pool is an exciting time for homeowners. The easy part is planning the fun features to include and envisioning the layout and surrounding landscape. However, with the anticipation of this new outdoor oasis is the need to prepare for workers to access and be in the area for the duration of installation.
By understanding the steps of the process, you will know what to expect and be able to better plan a pool installation. In Maryland, certain actions on the homeowner’s part can expedite this process—and similarly, a lack of preparation may slow it down.
Here is an overview of how long a Maryland in-ground pool installation typically takes, the steps that are required, and what homeowners can do to make the adventure as seamless as possible.
The Steps of an In-Ground Pool Installation in Maryland
Selecting the team of professionals for your project is the first step for an in-ground pool installation. This process should not be rushed; take the time to carefully compare the available options. Vet potential installers until you feel confident in the quality, timeliness, and longevity of an installer.
A reputable pool installer should willingly provide you with references and pictures of previous projects. They should also be able to clarify the scope and detail of their work and how it may align with your goals. Once you have chosen an installer, the next step is planning.
The contractor will work closely with the homeowner to create a plan for the pool’s final design, including the location, size, depth, orientation, and shape. This part of the process may also include landscaping goals and integrating the pool with the property visually and functionally, depending on the quality of the builder you selected.
Finally, once the designs have been drafted and approved, and all necessary permits have been obtained, the pool’s construction can begin. Regardless of whether you select a concrete or vinyl inground pool, the space will need to be excavated to create the basin for the supporting structures.
Plumbing and electrical components will then be installed, as well as any relevant preparations for hardscapes such as waterfalls or rain sheets.
Once a concrete pool has been built, it will require a period of time to cure before homeowners can swim in it. In general, this period is short, and patience ensures that the pool sets properly and lasts for as long as possible.
Any pool, once filled, will typically require a period of time to properly treat the fill water for proper chemical balance. This may take a couple days but ensures healthy, well-balanced water for swimmers and the pool components.
How Long an In-Ground Pool Installation Takes
The length of time a pool installation takes will vary widely depending on the features of the pool, as well as how decisive homeowners are. It is not unreasonable to spend weeks vetting builders and installers.
With the installer of your choice, the designing, drafting, and permit phases begin and can take three to six weeks on average. A reputable installer will check in with the homeowner regularly to provide updates, set expectations, and confirm schedules as well as access requirements for the construction location. This may include gate, codes, and securing of pets.
The actual pool installation may take only a few days, potentially up to a week depending on the complexity of the design. Small, rectangular pools may be more easily installed than large, deep pools in intricate shapes with patterned finishes. However, the extra time required to install a highly detailed pool should not discourage homeowners from pursuing their ideal backyard vision.
Factors Influencing the Timeline
Some aspects of the pool installation timeline are within the control of homeowners. These include how long they spend on vetting and researching builders, as well as how much preparation they have done beforehand on the designs, patterns, and features they would like to see in a pool.
To expedite the process, invest time before installation begins to determine where you would like the pool to be installed and what elements are most important to you. Having these answers on hand will significantly reduce delays when the drafting phase begins.
Once installation has started, be sure to keep the area clean and unencumbered allowing workers to get in and out of the space as efficiently as possible.
Get Professional Maryland Pool Installation from the Experts